Run a solar site feasibility screen

Resource, interconnection, permitting, and economics screened in order of deal-killer risk.

intermediate~40 minSolar EngineersEnergy AnalystsProject Developers

Steps

  1. 1Screen interconnection FIRST: queue position, capacity headroom, upgrade cost estimates
  2. 2Assess resource data quality (measured vs modeled) and shading geometry
  3. 3Verify land control options and zoning/permitting pathway realistically
  4. 4Model economics with P50 production, current incentives, and downside tariff cases
  5. 5Rank fatal flaws before nice-to-haves; walk early when screens fail
  6. 6Document assumptions versioned — feasibility memos get re-litigated

Common Pitfalls

  • ▲Falling in love with great sites the grid cannot serve
  • ▲Modeled resource accepted without measured validation

Commands

Install with skills CLI
$ npx skills add aniruddhaadak80/skills --skill solar-site-feasibility
Install globally
$ npx skills add aniruddhaadak80/skills --skill solar-site-feasibility -g

Tags

#solar#feasibility#development#energy-renewables#project-development

Related skills

P50/P90 discipline, loss-tree transparency, and as-built model updates protecting projections.

🔋 Energy & Renewables·~35m

Test sequences, punch lists, and turnover documentation preventing day-one surprises.

🔋 Energy & Renewables·~30m